환영 고객!

회원

도움말

Cixi Junyi Plastic Industry Co., Ltd
주문 제조자

주요 제품:

plast-mach>제품
제품 카테고리

Cixi Junyi Plastic Industry Co., Ltd

  • 이메일

    1273824124@qq.com

  • 전화

    18858078774

  • 주소

    Wuyuqiao Taoyuan, Henghe Town, Cixi City

지금 연락

Which is a good PE sewage elevator with multiple specifications

협상 가능업데이트03/15
모델
제조업체의 성격
생산자
제품 카테고리
원산지 Place of Origin

개요

PE sewage elevator roll molding integrated polyethylene material with diverse shapes and customized colors according to needs "is the overall structure of the equipment, which does not require the construction of a new sewage tank, occupies a small area, and saves investment;

제품 정보

PE sewage elevator

Wastewater lifting equipment "is an intelligent product developed by our company specifically for wastewater lifting. In terms of design ideas, traditional lifting methods have been adopted, combining concepts such as "solid-liquid separation", "backwashing", and "intelligence" to design a series of intelligent devices for sewage lifting.

外置污水箱.png


Solid liquid separation "is the process of separating impurities, entanglements, and hard objects from wastewater to ensure the normal operating environment of the water pump, greatly extending its lifespan and reducing maintenance rates;


Backwashing "is the process of using the pressure of a water pump to calculate the hydraulic model and backwash the debris that remains in the solid-liquid separator, lifting it into the municipal pipeline network. At the same time, a high-pressure water flow backwashs the bottom of the water tank, leaving no hiding place for any sludge that may be in the sewage, and lifting it into the municipal pipeline network with the water flow;

内置污水箱.png


'One T' refers to the overall structure of the equipment, which does not require the construction of a new sewage tank, occupies a small area, and saves investment;


'Intelligence' refers to its automated operation without the need for human supervision and operation.

Terms of Use


(1) Improvement of ordinary domestic water and toilet wastewater. For newly constructed buildings, the construction waste inside the pipelines must be cleaned before use;


(2) The pH range of sewage and wastewater is 4-10;


(3) The temperature range of sewage and wastewater is 0 ℃~40 ℃; (4) Oil containing wastewater from restaurants and kitchens, as well as hair containing wastewater from bathhouses, must undergo oil separation and hair removal treatment before use.

PE sewage elevator